Monday, March 30, 2009
Are we there yet?
Changed all four shocks (destroying 5 lug nuts in the process); sanded and painted the wheel rims; fixed torn boots; re-greased a CVC joint; removed remains of old heater system and plugged the holes; and fixed the front passenger side floor pan (it was starting to look like something from the Flintstones with your feet hanging out and peddling really fast). And with that, other than some minor tweaks and bleeding the brakes, the hardcore mechanical work is done! Now it's on to the painting, carpeting, and interior tweaks. Yeah!
Subscribe to:
Post Comments (Atom)
No comments:
Post a Comment